Stormwater Control System (SCM) Linking
Pond & StormwaterAn inspection revealed a leak in the stormwater control (SCM) system. Upon excavation, water was leaking from the pond beneath the riser and from both 3-foot diameter reinforced concrete pipes (RCPs) at the outlets. The leak was traced to an unsealed joint about 5 feet from the riser, underneath the top of the dam.
To address it, geotechnical sealing was applied around the riser and between the outlet RCPs, and the joints were sealed with hydraulic cement. Finally the area was stabilized and the project was completed.